A generation asset is only as valuable as its ability to export power reliably and efficiently to the grid. Helium Power Energy's power systems engineers manage the full technical and commercial grid connection process — from initial network studies through to physical commissioning and long-term grid code compliance — for assets up to 400 kV across multiple jurisdictions.

400 kV
Max. transmission voltage
< 12 mo
Typical connection timeline
G99 / G100
Grid code compliance
0 delays
Target: zero commissioning delays
What We Deliver

Connected.
Compliant. Optimised.

Grid Connection Studies

Load flow analysis, short-circuit studies, power quality assessments, and protection coordination — delivered in formats accepted by all major TSOs and DNOs. We interface directly with National Grid ESO, REE, RTE, and TenneT.

Transmission Network Design

HV/EHV substation design (11 kV to 400 kV), transformer sizing, overhead line and cable routing, insulation coordination, and earthing system design — fully compliant with IEC 60071, BS EN 61936, and local grid codes.

Grid Code Compliance

Full G99, G100, ENTSO-E RfG, and IEC 61400-21 compliance packages including reactive power capability curves, LVRT/HVRT modelling, frequency response settings, and type-testing coordination with OEMs.

Grid Interface Optimisation

Power Factor Correction (PFC/SVG), harmonic filter design, transformer tap optimisation, and real-time voltage/VAR control systems. Maximises export revenue by reducing curtailment and reactive power charges.

Grid Code Coverage

Global Regulatory
Expertise.

Grid Code / Standard
Region
Regulatory Body
G99 / G100
Great Britain
National Grid ESO
ENTSO-E RfG
Continental Europe
ENTSO-E / ACER
NERC FAC-001
North America
NERC / FERC
AS 4777 / NER
Australia
AEMO
IEC 61400-21
International
IEC TC 88
Connection Process

From Application
to First Export.

01

Pre-Application Enquiry

Early-stage dialogue with the network operator to identify the connection point, indicative capacity, and assess any reinforcement requirements on the existing network.

02

Offer & Acceptance

Managing the offer negotiation process, challenging unreasonable reinforcement costs, and advising on contract terms — including the Transmission Connection Asset (TCA) boundary.

03

Detailed Design & Testing

Substation, protection relay, and SCADA detailed design. Factory acceptance testing (FAT) of key equipment. Coordinating OEM and DNO/TSO interfaces throughout detailed design.

04

Commissioning & Energisation

On-site commissioning support, protection commissioning, and coordinating energisation with the network operator — targeting a seamless path to first export.

Why Choose Us

Our Grid Integration
Advantage.

Grid connection is frequently the critical path item for any generation project. Our in-house power systems team compresses timescales by managing the entire process in parallel with EPC delivery, and our established TSO/DNO relationships unlock faster responses and better connection terms.

In-house power systems engineers — no dependency on expensive third-party consultants
Established relationships with TSOs and DNOs across Europe and internationally
Proven track record challenging and reducing network operator reinforcement costs
Full SCADA/EMS integration with network operators for real-time dispatch
Battery and synchronous condenser solutions for grid code compliance
Post-connection performance verification and reactive power optimisation